Wind park Bedesbach

Project overview

For the Bedesbach wind farm, five wind turbines with a total output of 17.25 MW were constructed and successfully put into operation beginning of 2020.

As a result of the reforestation with native, locally appropriate deciduous tree species and the replacement of coniferous populations with mixed populations rich in deciduous trees, the entire area ultimately has almost 3 ha more valuable forest than before.

Bedesbach

in Rhineland Palatinate

17.25 MW

of installed capacity

5

wind turbines

Technical information
Commissioning2020
LocationBedesbach, Rhineland Palatinate
Capacity17.25 MW
Type of wind turbinesVestas
Number of wind turbines5
Hub height149 m