Wind park Freimersheim

Project overview

For the construction of the Freimersheim wind farm, electrically powered construction machines such as electric excavators were used for the first time.

Calculated over its entire service life of 10,000 operating hours, the 7 t electric excavator generates 86% less CO2 emissions, saving 170 t of CO2. The excavator is also up to 10 decibels quieter than a diesel vehicle.

Freimersheim

in Rhineland Palatinate

18 MW

of installed capacity

5

wind turbines

Technical information
CommissioningMay 2022
LocationFreimersheim, Alzey, Rhineland Palatinate
Capacity18 MW
Type of wind turbinesVestas V136
Number of wind turbines5
Hub height149 m