Wind park Freimersheim
Project overview
For the construction of the Freimersheim wind farm, electrically powered construction machines such as electric excavators were used for the first time.
Calculated over its entire service life of 10,000 operating hours, the 7 t electric excavator generates 86% less CO2 emissions, saving 170 t of CO2. The excavator is also up to 10 decibels quieter than a diesel vehicle.
Freimersheim
in Rhineland Palatinate
18 MW
of installed capacity
5
wind turbines
| Technical information | |
|---|---|
| Commissioning | May 2022 |
| Location | Freimersheim, Alzey, Rhineland Palatinate |
| Capacity | 18 MW |
| Type of wind turbines | Vestas V136 |
| Number of wind turbines | 5 |
| Hub height | 149 m |