Wind farm Bedesbach
Project overview
For the Bedesbach wind farm, five wind turbines with a total output of 17.25 MW were constructed and successfully put into operation beginning of 2020.
As a result of the reforestation with native, locally appropriate deciduous tree species and the replacement of coniferous populations with mixed populations rich in deciduous trees, the entire area ultimately has almost 3 ha more valuable forest than before.
Bedesbach
in Rhineland Palatinate
17.25 MW
of installed capacity
5 wind turbines
from the manufacturer Vestas, hub height 149 meters