Wind farm Jembke
Project overview
Since October 2025 the three new wind turbines at the Jembke wind farm in the district of Gifhorn in Lower Saxony have been in operation. The wind farm consists of two N-149 turbines and one N-131 turbine. It is directly adjacent to the Boldecker Land wind farm, which already comprises eleven existing turbines.
As of September 27, 2024, ENOVA Windpark Jembke Betriebs GmbH & Co KG is the new owner and operator of the wind farm. ENOVA also owns the existing Boldecker Land wind farm and is planning to repower the old turbines.
Key data at a glance
Municipality of Jembke & Barwedel
district of Gifhorn, Lower Saxony
3
wind energy turbines
15.3 MW
installed capacity
32,000 MWh
annual electricity yield
> 10,200 households
electricity yield corresponds to the needs of more than 10,000 households
> 13,200 tons CO2
are saved annually