local case study

Germany

Barth I - VI

BayWa r.e. has already built one of the largest solar parks in Mecklenburg-Western Pomerania with the three construction phases Barth I-III - the total output is around 50 MWp. Barth IV-VI followed in 2019 with a further 18.7 MWp, including Barth V, Germany's first subsidy-free solar park with 8.8 MWp.

The airport is able to cover all of its operational costs through the rental income from the 80 hectares of land. This project generates enough electricity to cover the needs of over 21,000 average German households.

Airport Strahlsund-Barth in Mecklenburg-Western Pomerania
68.7 MWp of installed capacity
Ground-mounted installation

local case study

Deutschland

Barth I - VI

BayWa r.e. has already built one of the largest solar parks in Mecklenburg-Western Pomerania with the three construction phases Barth I-III - the total output is around 50 MWp. Barth IV-VI followed in 2019 with a further 18.7 MWp, including Barth V, Germany's first subsidy-free solar park with 8.8 MWp.

The airport is able to cover all of its operational costs through the rental income from the 80 hectares of land. This project generates enough electricity to cover the needs of over 21,000 average German households.

Airport Strahlsund-Barth in Mecklenburg-Western Pomerania
68.7 MWp of installed capacity
Ground-mounted installation

Project Location

Technical Information

LocationAirport Strahlsund-Barth, Mecklenburg-Western Pomerania
Installed capacity68.7 MWp
Connection to the gridBetween December 2012 and October 2019
ModulesFixed tilt
Type of installationGround-mounted
Our RoleDevelopment, EPC, Operation and Maintenance