local case study
GermanyFor the construction of the Freimersheim wind farm, electrically powered construction machines such as electric excavators were used for the first time.
Calculated over its entire service life of 10,000 operating hours, the 7 t electric excavator generates 86% less CO2 emissions, saving 170 t of CO2. The excavator is also up to 10 decibels quieter than a diesel vehicle.
Commissioning | Q3 2022 |
---|---|
Location | Freimersheim, Alzey, Rheinland-Pfalz |
Capacity | 18 MW |
Type of wind turbines | Vestas V136 |
Number of wind turbines | 5 |
Mast height | 149m |